Skip to content
Search for:
Toggle Navigation
Join OIPEEC
My Account
Cart
0
Toggle Navigation
Home
Bookstore
News
Letter From The Editor
OIPEEC Obituaries
Latest Technical Papers
Call for Papers
Call for Papers
How to Submit a Paper
About
Constitution
Management Committee
Scientific/Reviewing Commitee
Honorary Members of OIPEEC
Past Presidents of OIPEEC
OIPEEC Award
Heritage
OIPEEC Members
Conferences
Resources
Membership Renewal
Publications
Standards
Databases
WWW Links
Contact
Search for:
Toggle Navigation
Home
Bookstore
News
Letter From The Editor
OIPEEC Obituaries
Latest Technical Papers
Call for Papers
Call for Papers
How to Submit a Paper
About
Constitution
Management Committee
Scientific/Reviewing Commitee
Honorary Members of OIPEEC
Past Presidents of OIPEEC
OIPEEC Award
Heritage
OIPEEC Members
Conferences
Resources
Publications
Standards
Databases
WWW Links
Join OIPEEC
Membership Renewal
Contact
My Account
Cart
Bookstore
Sort by
Popularity
Sort by
Default Order
Sort by
Name
Sort by
Price
Sort by
Popularity
Influence of contact pressures
€
0.00
The Prediction of Fatigue Endurance of Riser Tensioner Ropes for Floating Drilling Rigs as a Function of Location
€
0.00
The effect of wire breaks and overload on wire strain differences in six strand wire rope under tensile fatigue
€
0.00
Bulletin 7 – News and Working Groups 1966
€
0.00
A Representative Fretting Wear Test for Wire Rope Internal Contacts: What Are Key Lubrication and Tribological Parameters?
€
0.00
FINITE ELEMENT SIMULATION OF A STEEL WIRE ROPE HANGING FROM A SHEAVE, CALCULATION OF THE STRESS HISTORY IN THE WIRES
€
0.00
COMPUTER AIDED DESIGN OF BRAIDED ROPES – STRATEGIES FOR CONSIDERING THE DEFORMATIONS OF SINGLE YARNS
€
0.00
THE REALITY OF TESTING DIRECT STEEL WIRE REPLACEMENT WITH A FIBRE ROPE ON A CONVENTIONAL DRUM WINCH MOUNTED WITHIN A SUBSEA UTILITY CRANE
€
0.00
Fibre rope tensile fatigue and its applicability to vessel mooring performance assessment and suitability
€
0.00
Innovative drum construction for multi-layer winding with fibre ropes
€
0.00
From 4 mm to 50 mm rope diameter – Scaling up a new termination for high-modulus fibre ropes
€
0.00
New calculation method for riser-tensioner ropes
€
0.00
Impact of internal construction friction upon the torsional behaviour of mine wire ropes.
€
0.00
The influence of twist on tension-tension fatigue of wire ropes Part II
€
0.00
Safe use of hoisting drums wound with multiple layers of wire, hybrid, fibre and/or large diameter ropes
€
0.00
Innovative visual rope inspection method for maintenance
€
0.00
Modelling fatigue damage distribution to inform slip and cut policy for riser tensioner ropes
€
0.00
Limited endurance of full lock coil ropes in service on ropeways
€
0.00
Non-destructive testing of mining ropes: technical and economical aspects
€
0.00
Even relief of stress in a rope may have disastrous consequences: Two examples
€
0.00
Extreme rope rotation
€
0.00
Summary of terms and definitions for EN 12385-2
€
0.00
Steel wire ropes with variable lay lengths for mining applications
€
0.00
Measurement of abrasive wear on wire ropes using non-destructive electro-magnetic inspection
€
0.00
Tension-torsion fatigue effects in wire ropes
€
0.00
On the Spiral element calculation model in steel wire rope bending problems
€
0.00
Why was it the rope that broke and not the wing? A few Observations on the air accident at Cavalese, ltaly on 3rd February, 1998
€
0.00
On the bending stiffness of spiral multi-layer strands
€
0.00
The torsional behaviour of triangular strand ropes for drum winders
€
0.00
Considerations of mine hoisting rope contraction
€
0.00
Previous
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
···
19
20
21
22
23
24
25
26
27
28
Next
Page load link